If the increased backpressure does not affect system performance, no maintenance is necessary.

Procedure

  1. Check the inlet frits on the guard and analytical column and replace them if necessary. The most common cause of increasing system back pressure is a contaminated frit in the analytical or guard column inlet end fitting. The complete instructions for replacing column bed support assemblies are in Document No. 032285.
  2. Recheck the system back pressure. If it remains high, go on to the next step. Eluents and samples should be filtered using 0.45 μm filters.
  3. Find and eliminate any system blockage. Bypass the Dionex SC-CERS 500 by coupling the lines attached to the ELUENT IN and ELUENT OUT ports.
  4. If the back pressure decreases by less than 150 psi with the Dionex SC-CERS 500 out of line, a blockage in the system rather than in the Dionex SC-CERS 500 is causing the high pressure
  5. Remove a blockage from Dionex SC-CERS 500 by reversing the eluent flow. If the back pressure decreases by more than 150 psi with the Dionex SC-CERS 500 out of line, the high pressure may be caused by a blockage in the Dionex SC-CERS 500. Reverse the direction of flow of the eluent or both the eluent and the external water through the Dionex SC-CERS 500.
  6. After the pressure drops, allow eluent, or eluent and regenerant, to flow to waste for several minutes after the pressure drops. Perform the steps in Installation and start up and reinstall the Dionex SC-CERS 500 in the appropriate configuration.
  7. Clean the suppressor membranes if reversing the flow through the Dionex SC-CERS 500 does not decrease the pressure (see Cleanup).
  8. Replace the Dionex SC-CERS 500 if cleaning the suppressor membrane does not reduce the pressure.