It is the policy of Thermo Fisher Scientific that the customer must not unpack the system or accessory items before the installation of the system.
TIP
Where buck/boost transformers or power conditioning units are supplied, it is the responsibility of the operator to have these units installed by an electrician before instrument installation.
A forklift or a pallet jack can help with unpacking the instrument components and transporting them in-house.