Prepare the installation - Prepare the installation - Orbitrap Excedion Series Preinstallation Requirements Guide - LC-MS Mass Spectrometry - Orbitrap Hybrid Series - Orbitrap Excedion Series Preinstallation Requirements Guide - Prepare the installation - Orbitrap Hybrid Series - topic

Orbitrap Excedion Series Preinstallation Requirements Guide

Product Tree
Spectrometry > Mass Spectrometry > LC-MS Mass Spectrometers > Orbitrap Hybrid Series
Document Type
Preinstallation Guide
  • Orbitrap Excedion Series
  • Installation request form
  • Technical data
  • About this manual
  • Special notices and safety symbols
  • Typographical conventions
  • Access documentation
  • Reference documentation
  • Site preparation
  • Entrance requirements
  • Space and load requirements
  • Workbenches
  • Workbench for the data system
  • Workbench for the LC/MS system
  • Instrument dimensions
  • Move the instrument
  • Place the forepump
  • Connect the forepump
  • Pump status control
  • Operating environment
  • Temperature
  • Heat output
  • Humidity
  • Lighting
  • Altitude
  • Dust-free environment
  • Vibration
  • Radio frequencies
  • Electrostatic discharge
  • Line power
  • Basic power requirements
  • Power supply
  • Power cords
  • Connect the mass spectrometer and the modules to wall outlets
  • Place the power outlets
  • Power outlets in laboratories
  • Install a residual current device (RCD) in the laboratory building
  • Quality of power
  • Power monitoring devices
  • Power conditioning devices
  • Uninterruptible power supply
  • Technical assistance
  • Typical power consumption
  • Consumables
  • Nitrogen gas
  • Fittings and parts
  • Solvent recommendations
  • Cleaning agents
  • Exhaust and waste
  • Exhaust system
  • Solvent waste
  • Ventilation
  • Prepare the installation
  • Instrument arrival
  • Transit damage
  • Installation
  • Install the system
  • Key operator
  • Equipment needed for installation
  • Calibration solution
  • Dispose of packaging material
  • Advanced training courses
  • Preventive maintenance
  • Customer feedback
  • Legal notices
  • Copyright and trademarks
  • Compliance information
  • FCC Compliance statement
  • WEEE Compliance statement
  • EU REACH statement
  • Release history
  • Index

Before the installation, make sure that all preparations described in the previous chapters are complete.

Contents

  • Instrument arrival
  • Installation
  • Dispose of packaging material
  • Advanced training courses
  • Preventive maintenance
Back to home page