• Check the Dionex Inuvion IC System component panel for leaks or spills, especially around the drip tray (see Dionex Inuvion Core IC System component panel (with column holder and regenerant pump installed) and Operating features.
  • Wipe up spills. Isolate and repair leaks (see Liquid leaks). Rinse off any dried eluent with deionized water.
  • Check the eluent bottle. When necessary, refill the eluent bottle with eluent for the Dionex Inuvion Core and Dionex Inuvion IC Systems. If the Dionex Inuvion IC System with RFIC is installed (or any system with RFIC capabilities), refill the eluent bottle with ASTM filtered, Type I (18.2 megohm-cm) deionized water that meets the specifications listed in Deionized water requirements for IC.
  • Monitor the waste container and empty it as needed.