Follow the preventative maintenance schedule for periodically checking the AccelerOme instrument modules for damage or wear and replace them as and when necessary.

Preventative maintenance schedule

Maintenance procedure

Frequency

Clean the instrument

Monthly

Check and replace the solution tubes

Monthly

Check and replace the waste line

Monthly

Check teaching and perform install qualification (IQ) test

Annually

Check the dilutor syringe for any damage or wearing and replace if necessary.

Annually

Check if the flow path of the syringe is clear.

Annually

Check for leaks at the syringe/valve connection.

Annually

Check if the liquid drains to the waste container upon priming the solution lines.

Annually